Todd Drummond

The Drummond Short Schedule Time-Standard System

Todd Drummond

Using Man-Minutes to Manage Your Labor Industrial engineering – “The branch of engineering that is concerned with the production of industrial goods, especially by the design of efficient plants and procedures and the management of materials, energy, and labor.” (Source:...

#11236 Cover image
March 2019
Issue #11236
Page 39
Todd Drummond

Estimating Truss Labor Using Board Footage Versus Proper Man-Minute Time Standards

Todd Drummond

For many years, I have been beating the drum that board footage (BF) is an imperfect unit measurement that our industry should abandon. The better alternative is the proven method of time estimations which uses man-minutes (MM). Man-minutes are derived from time-in-motion practices that have...

#10228 Cover image
July 2018
Issue #10228
Page 22
Ben Hershey

How Does Your Company Performance Measure Up? The Importance of Benchmarking

Ben Hershey

I read a book recently that discussed the term “benchmark” and its origins as relates to business. Surprisingly, the term originates within the history of guns and ammunition. In fact, with the same aim we use it today—comparison and improved performance. The book talked...

#10228 Cover image
July 2018
Issue #10228
Page 34
Joe Kannapell

Wood Components in Multi-Family Housing, Part Three

Joe Kannapell

Part Three:  Apartment Survival Strategies in the 1980s A few stalwarts “lived to tell” how they survived the Eighties, but none knew magic. What they did then works just as well today—expanded markets, refined quotes, and controlled costs. And in the collapsing...

#10226 Cover image
May 2018
Issue #10226
Page 6
Todd Drummond

Industrial Engineers Needed in Our Wood Component Manufacturing Industry

Todd Drummond

Industrial engineering – “The branch of engineering that is concerned with the production of industrial goods, especially by the design of efficient plants and procedures and the management of materials, energy, and labor.” (Source – The Free Dictionary) The Lean...

#10224 Cover image
March 2018
Issue #10224
Page 30
Ben Hershey

Houlihan, Efficiency, Lean, & the 5M’s

Ben Hershey

How can we measure and improve employee productivity? It’s a common question now, one that I am often asked within the Component and LBM industry, but that wasn’t always the case. We’ve come a long way and learned a lot! Back in 1911, mechanical engineer Frederick W. Taylor,...

#10216 Cover image
July 2017
Issue #10216
Page 56
Todd Drummond

A Critical Part Missing from Six Sigma and Lean Practices for Most Companies

Todd Drummond

It has taken many years, but the component industry has finally caught onto the practices of lean manufacturing and applied them to truss and wall manufacturing. An example is the huge turnout at the sponsored seminars by Todd Drummond Consulting at the 2016 BCMC show of “The Path of Least...

#09209 Cover image
December 2016
Issue #09209
Page 22
Ben Hershey

Continuous Improvement

Ben Hershey

Continuous Improvement  – Success is achieved, not from the program, but from the mindset Theory of Constraints. The Houlihan Labor Method. Quick Response Manufacturing. Six Sigma. Lean. Total Productive Maintenance. Total Quality Management. The lexicon, tools, and methods...

#09204 Cover image
July 2016
Issue #09204
Page 62

Search By Keyword

Book icon Issuu Bookshelf