Garry Roehr

How Fast Does a Wall Panel Factory Need to Be in North America?

Garry Roehr

How fast should a wall panel line be? A lot faster than it takes to frame on site. Sure, if the framing and sheathing speed is the same as on site there are still savings in reducing overall build time and the accompanying finance and insurance costs. But, framing on site doesn’t require...

#18323 Cover image
June 2026
Issue #18323
Garry Roehr

Take a HyperLeap with AMT Robotics

Garry Roehr

Last month, in “Say Hello to AMT Robotics,” I introduced our Datum Squaring Table. This month, I’d like to focus on our HyperLeap Sheathing Bridge. You’ll find that our modular approach allows you to install the machine that best suits your current needs while giving...

#18322 Cover image
May 2026
Issue #18322
Page 99
Garry Roehr

Say Hello to AMT Robotics

Garry Roehr

Last fall, I had the chance to catch up with many of my peers at BCMC Omaha, and now I’m pleased to say Hello to an even wider audience. As an Industrial Engineer with 3 decades’ experience in PreFab, I am eager to share our innovative solutions to continue to help move our industry...

#18321 Cover image
April 2026
Issue #18321
Page 70

Search By Keyword

Issues

Book icon Read Our Current Issue

Download Current Issue PDF