Number of search results: 134
Stop Chasing Efficiency, Remove the Bottleneck, and Let Profits Rise
Todd Drummond
Most companies don’t have a performance problem. They have a flow problem.
They have good people, decent equipment, and plenty of effort on the floor, but the numbers that matter most still refuse to move. Output stays flat, lead times stretch, overtime becomes the norm, customers feel...
February 2026
Issue #18319
Page 62
The OODA Loop and the New Reality of the Truss and Wall Panel Industry
Todd Drummond
The OODA Loop, developed by U.S. Air Force Colonel John Boyd, stands for Observe, Orient, Decide, Act. While often discussed as a tactical framework, its real value lies at the organizational level. The OODA Loop describes how companies perceive reality, interpret information, make decisions,...
January 2026
Issue #18318
Page 62
The Truth About AI, Plate Vendors, and the Future of Design Services
Todd Drummond
According to Elon Musk, “Grok 4 is already at the intelligence of a PhD in every profession.” Anyone paying attention to the rapid developments in AI understands that this statement is not exaggeration—it is a warning. Within a very short period of time, AI systems will be able...
December 2025
Issue #17317
Page 86
The True Cost of Ambition
Todd Drummond
What is a job or career truly worth to you? How do you define your own worth?
Imagine knowing, before accepting a new position, that it might cost you something far greater than time — that it could erode your closest relationships, damage your marriage, or distance you from your...
November 2025
Issue #17316
Page 90
Far More Than Simple Cost Saving with TDC Time Standards Used with Paragon and AppWright
Todd Drummond
Last month’s article, “Pure Online Magic with Paragon, TDC Time Standards, and AppWright Job Management,”introduced the new and powerful synergy of Paragon and AppWright, which includes the TDC time standards offering. TDC time standards (R.E., S.U., or Man-Hours based on time...
October 2025
Issue #17315
Page 28
Pure Online Magic with Paragon, TDC Time Standards, and AppWright Job Management
Todd Drummond
If you want to give your company a new competitive edge while reducing costs and improving profitability, then you’ll want to hear what TDC has connected using Paragon and AppWright. Coming this October at BCMC, find out how your company can reduce costs, improve your manufacturing...
September 2025
Issue #17314
Page 26
Lean Manufacturing Only Works with the Best Employee Management Practices
Todd Drummond
Anyone with any training in lean practice has heard of standard terms such as the Five “S” and “Just in Time.” What is not discussed often enough is that lean principles are based on healthy management and employee relations, which is the foundation of the...
August 2025
Issue #17313
Page 26
The Time for Improvement is Always Now
Todd Drummond
The summer build season is upon us, so the familiar daily time constraint challenges are back. Yet this summer build season is not like the past few years. In many regions, sales are not as strong, so margins are dropping to keep the sales volume needed to remain profitable. During the winter...
July 2025
Issue #17312
Page 24
True Employee Motivation and Satisfaction
Todd Drummond
When discussing employee staffing issues during consultations, wages and long-term employment are inevitably part of the conversation. After decades of advisement, it is no longer a surprise to me about the disconnect between what executives think is most important to the employees versus what...
June 2025
Issue #17311
Page 30
Being Aware of Lost Productivity
Todd Drummond
Our perception forms what we think is the “true” reality, and our reality is always biased based on preconceived ideas, limited perspectives, and the big one of protecting our ego. So, how willing are you to review your area of responsibility for improvement beyond what you...
May 2025
Issue #17310
Page 28
5 Joist Hanger Mistakes That Could Fail Your Inspection—And How to Avoid Costly Repairs and Callbacks
Todd Grevious, PE
Joist hangers are simple to install, but ignoring details can cause issues with inspectors and lead to project delays. At our office, we often see the same mistakes repeated—simple errors that are easy to avoid with proper care and following best practices. Here are the five most common...
November 2025
Issue #17316
Page 128