Edmond Lim, P.Eng.

How to Rev Up During a Long Lead Time

Edmond Lim, P.Eng.

Just when you have calculated your traditional CapEx ROI saying “Yes,” you cannot pass “Go” until 2023 because your new machinery lead time is a year away.  Now what? Now you should prepare for it! Instead of focusing on the wait, get better organized before your...

#14277 Cover image
August 2022
Issue #14277
Page 50
Todd Drummond

Capital Investments are Not Going to Be Enough When the Party is Over

Todd Drummond

The article I published in April, Record CM Building Industry Net Profits are Coming to an End Sooner Than Most Believe, predicted that the construction industry would start seeing negative market changes around August of this year. Wow, was I right about calling that one? The continued...

#14276 Cover image
July 2022
Issue #14276
Page 28
Edmond Lim, P.Eng.

ROI with No “Space” Fear Factor

Edmond Lim, P.Eng.

In today’s volatile economy, there is comfort in knowing the significant housing backlog will rely on the components industry to keep on supplying. Trusses are the original off-site construction industry begun more than 60 years ago, and the number of truss plants and capital investments...

#14276 Cover image
July 2022
Issue #14276
Page 60
Todd Drummond

Three Simple Truths for Attracting and Retaining Talented Employees

Todd Drummond

Is your company having problems finding good employees to fill all the needed positions within your company? Are you thinking wage inflation is getting out of hand? Perhaps you should look at it from a different perspective. Multiple case studies have shown that companies with low employee...

#14275 Cover image
June 2022
Issue #14275
Page 29
Edmond Lim, P.Eng.

How to Squeeze Out More Truss Production

Edmond Lim, P.Eng.

Trusses are complicated yet the fabrication description is quite simple – pick the lumber, cut the lumber, and assemble the lumber. Now try doing this profitably at high volume and you will need to automate some or all of these processes, which all truss plants have done within their...

#14275 Cover image
June 2022
Issue #14275
Page 56
Todd Drummond

Detailed Process for Implementing an Effective Labor Incentive Program

Todd Drummond

One of my clients’ most often asked questions is, “How exactly do we track and implement an incentive program?” Most companies are willing to pay their manufacturing employees more wages (incentives) based on greater output. Yet, the vast majority of wood truss component...

#14274 Cover image
May 2022
Issue #14274
Page 35
Edmond Lim, P.Eng.

Debunking the “Automation Takes Too Much Space” Myth

Edmond Lim, P.Eng.

Can you spot the Lumber PickLine in the satellite image? Contrary to the myth that it will “take up too much space,” a lumber PickLine can actually save space by utilizing existing truck lanes and by following existing forklift flow. For example, this outside PickLine has ample 35 ft...

#14274 Cover image
May 2022
Issue #14274
Page 54
Todd Drummond

Record CM Building Industry Net Profits are Coming to an End Sooner Than Most Believe

Todd Drummond

What a ride it has been for the vast majority of the component manufacturing (CM) for wood trusses and wall panels in North America the past few years. The demand for new homes outpaced the supply capacity of most homebuilders and those who suppy them. This record-breaking rate of building...

#14273 Cover image
April 2022
Issue #14273
Page 35
Todd Drummond

Millions of Dollars for New Equipment and Building Investments are Being Wasted

Todd Drummond

Expanding the manufacturing capacity within the component manufacturing (CM) industry for wood trusses and wall panels is at a fever pitch. The overwhelming majority of CMs have the same limited capacity issue trying to keep up with sales, which led to excellent record-breaking sales volumes and...

#14272 Cover image
March 2022
Issue #14272
Page 35
Edmond Lim, P.Eng.

Increasing Efficiency Gains From Plant Optimization

Edmond Lim, P.Eng.

My January article, Optimize Your Saw with a Lumber PickLine, focused on “Feeding the Beast!” and replacing inefficient, expensive, and labor-intensive “forklift lumber picking” with our improved material handling system. Then, my February article, Threading the Needle...

#14272 Cover image
March 2022
Issue #14272
Page 54
123578910Last

Search By Keyword

Issues

Book icon Read Our Current Issue

Download Current Issue PDF